The following is the projected schedule for parking lot maintenance on the Pocatello Campus. Please visit the ISU Construction Map for detailed information about construction on campus.
Parking Lot | Notices | Dates |
G12 | Alumni Center Construction at Holt Arena. | June 2023 |
G13 | East Side of Holt Arena will be blocked for Construction Equipment. | March-July 2022 |
R01 | 10 Spaces in R01 for Construction in Liberal Arts. | May-August 2022 |
R05 | 10 Space in R05 for Starbucks Construction in Eli M. Oboler Library. | May-September 2022 |
R02 | Steam Tunnel Construction: Road will be closed on 8th Street between E Carter and Martin Luther King Dr. Spaces on the north side of R02 will be affected. Please follow any directional signs. | May-September 2022 |
R04 | 12 Spaces in R01 will be utilized as a lay down area for the Eli M. Oboler Library roof construction. R04 permit holder will be allowed to park in the R05 or General parking spaces in this area as necessary. | July-December 2022 |
Please note that these closures will be early in the morning and every attempt will be made to make sure that parking is available. If full lot closure is necessary, we will advise of alternate parking locations. Be advised, this schedule is subject to change. Please be mindful of cones, wet paint, and any directional signage.